Thursday, March 29, 2012
Wednesday, March 28, 2012
Thursday, March 22, 2012
Climbing Wall research
The sharp elevation change in Morningside Park makes it a great site for climbing. A climbing wall would allow visitors to physically connect with the site in a very spatial and tactile way.
Thursday, March 8, 2012
Class Brief
Formworks hybridizes methods of casting with digital fabrication. In doing so, we challenge the repetitive nature of casting and formwork by developing a parametric, dynamic formworks system and producing a series of precast elements using that system. Students are introduced to advanced 3-axis millinjg, 1 and 2 part molds, silicone casting and a variety of casting materials. Students respond with their own system which takes these techniques and systems of organization, assembly and fabrication further.
Products of the formworks system may include:
- a series of parametrically related castings produce by a:
Products of the formworks system may include:
- a series of parametrically related castings produce by a:
· formwork which is performative and dynamic
· formwork which is a recombinant kit of parts.
· a kit of formworks that produce a series of interrelated parts
· a repetitive series that can recombine (flexible unit / kit of parts)
- a casting that is itself dynamic (material dynamics)
- a flexible structural system which employs the products of your formworks
Goals:
- Develop a sophisticated, well made formworks system
- Produce and assemble a large quantity of products from your formworks system
- Identify the architectural performance of the casting
- Site the products of your formworks
- Experiment with and present an argument for the material you used in your castings.
- Develop a tectonic between cast parts
· How do the products of your formwork aggregate and fit together?
· What other kinds of details, external structures and materials can you integrate?
- Relate the system to precedent projects
- Analyze the structural performance of the system
Schedule
Thursday, March 9th // Class 1:
Lecture and Tutorials:
- Lecture: "Dynamic Formworks"
- The Brief:
- Advanced methods in Rhino and Mastercam
- The Anatomy of the Formwork
- Working with Plaster
------------
Assignment: Reference Projects
Assignment/Class Brief: Recombinant Repetition (The 2 part mold)
Thursday, March 15th // NO CLASS, SPRING BREAK
Thursday, March 22nd // Class 2:
Due: Post project progress on blog
----------
Lecture and Tutorials:
- An introduction to Masonry joints
- An introduction to Masonry joints
- Advanced methods in Rhino and Mastercam continued.
- Formworks in Solidworks
- Working with Concrete
----------
Discuss: Discuss project progress
Thursday, March 29th // Class 03:
Due: Post project progress on blog
----------
Lecture and Tutorials:
- Silicone Methods
- Milling High Density foam
- Working with Resin
----------
Discuss: project progress
Thursday, April 5th // Class 04 (Class is moved to room 505)
- Project presentation w/visiting critics
Thursday, April 12th // Class 05:
- Desk Crits
Thursday, April 17th // Class 06:
- Desk Crits
Thursday, April 26th // NO CLASS; STUDIO FINALS
Subscribe to:
Posts (Atom)